Bids due in 28 days
1/9/19 10:00 am
South Street Utility Replacement Project (18-14)
City of Pullman
Pullman, Eastern WA
This project consists of replacing approximately 104 lineal feet of storm sewer and 107 lineal feet of sanitary sewer within and directly adjacent to South Street. Additional utility replacement activities include furnishing and installing two 48-inch diameter manholes, installing concrete pipe anchors, and connecting the new sewer pipe to existing manholes. Other work includes removing and replacing hot mix asphalt (HMA) pavement, concrete curb and gutter, and concrete sidewalk; landscape restoration; erosion control; trench safety; traffic control; and other associated items.
Bids due in 27 days
1/8/19 10:00 am
Paths 2019 (19-02)
City of Pullman
Pullman, Eastern WA
The work consists of construction of an approximately 3215’ long x 10’ to 12’ wide asphalt paved path as shown on the construction plans, 110’ of curb and gutter, 440 square yards of sidewalk, storm drain culverts, the construction of three (3) concrete ADA ramps, and other associated work.
Bidding Closed
12/4/18 10:00 am
Sidewalks 2019 (19-03)
City of Pullman
Pullman, Eastern WA
This project consists of removing and replacing approximately 475 square yards of cement concrete sidewalk, constructing approximately of 1215 square yards of new four-inch thick sidewalk, 198 square yards of five and a half thick sidewalk including four curb ramps, grinding approximately 580 linear feet of raised panel edges, and other miscellaneous related work.
Bidding Closed
11/14/18 10:00 am
Pullman WWTP - Headworks Perforated Plate Screen Project
City of Pullman
Pullman, Eastern WA
Work to be performed includes: 1. Demolition of existing equipment and structures in the Headworks Building. 2. Modification and rehabilitation of existing Perforated Plate Screen. a. A trained manufacturer’s technician will perform the following work: 1) Relocate motors to opposite side of screen. 2) Replace upper sprockets, lower sprockets, bearings, chain, and lower seal assembly. 3. Influent channel modifications. 4. New Perforated Plate Screen installation. a. The screen will be shipped to the site in multiple sections and assembled onsite inside the Headworks Building. A trained manufacturer’s representative will be onsite for a minimum of three (3) days and serve in a supervisory role for this work. 5. New Screenings Washer/Compactor installation. 6. Other miscellaneous electrical, controls, building, piping and valve improvements. 7. Related subsidiary work and incidental work in accordance with the Contract Documents.