Crestview Street and Miscellaneous Stormwater Improvements (18-01)

The work under this contract consists of removal of four large concrete block planters and vegetation, reconstruction of approximately 330 square yards of concrete entrance into SE 190 Crestview, solid rock reduction, construction of approximately 1040 LF of 7-foot wide sidewalk, one ADA Ramp, installation of three trench drain and/or underdrain storm collection systems with catch basins/inlets and cleanouts, excavation of a new drainage swale, pipe boring approximately 50 linear feet under a minor arterial, replacement of 65 linear feet of 6-inch diameter sanitary sewer line, and miscellaneous grading, paving, and concrete work.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
1 - Cover 488.2 KB
2 - Front End Documents 278.6 KB
3 - Standard Construction Specifications - 2018 Edition 278.4 KB
4 - General Specifications 137.6 KB
5 - Special Provisions 318.4 KB
6 - Standard Drawings 951.8 KB
7 - Prevailing Wage 531.5 KB