South Street Utility Replacement Project (18-14)

This project consists of replacing approximately 104 lineal feet of storm sewer and 107 lineal feet of sanitary sewer within and directly adjacent to South Street. Additional utility replacement activities include furnishing and installing two 48-inch diameter manholes, installing concrete pipe anchors, and connecting the new sewer pipe to existing manholes. Other work includes removing and replacing hot mix asphalt (HMA) pavement, concrete curb and gutter, and concrete sidewalk; landscape restoration; erosion control; trench safety; traffic control; and other associated items.