Paths 2019 (19-02)

The work consists of construction of an approximately 3215’ long x 10’ to 12’ wide asphalt paved path as shown on the construction plans, 110’ of curb and gutter, 440 square yards of sidewalk, storm drain culverts, the construction of three (3) concrete ADA ramps, and other associated work.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
1 - Cover Sheet 2.0 MB
2 - General Notes 1.5 MB
3 - Itani Plan & Profile - 0 and 00.00 to 10 and 50.00 2.6 MB
4 - Itani Plan & Profile - 10 and 50.00 to 21 and 00.00 2.5 MB
5 - Itani Plan & Profile - 21 and 00.00 to 22 and 60.81 1.4 MB
6 - Secondary 0 and 00.00 to 2 and 61.23 1.5 MB
7 - Itani Path - Horzontal Control 1.8 MB
8 - Itani Path XS - 0 and 00 to 5 and 50 1.7 MB
9 - Itani Path XS - 6 and 00 to 11 and 50 1.6 MB
10 - Itani Path XS - 12 and 00 to 17 and 00 1.5 MB
11 - Itani Path XS - 17 and 50 to 21 and 00 1.6 MB
12 - Secondary XS 0 and 00 to 2 and 61 1.3 MB
13 - Itani Path Cut and Fill Quantities 1.7 MB
14 - Sunnyside Walk Plan & Profile 0 and 00 to 5 and 34 3.3 MB
15 - XS - 0 and 00 to 5 and 34 2.0 MB
16 - Sunnyside Path Plan & Profile 0 and 00 to 7 and 24 2.7 MB
17 - Sunnyside Path XS - 0 and 00 to 5 and 50 2.0 MB
18 - Sunnyside Path XS - 6 and 00 to 7 and 24 1.1 MB
19 - Sunnyside Cut and Fill Quantities 1.3 MB