Paths 2019 (19-02)

The work consists of construction of an approximately 3215’ long x 10’ to 12’ wide asphalt paved path as shown on the construction plans, 110’ of curb and gutter, 440 square yards of sidewalk, storm drain culverts, the construction of three (3) concrete ADA ramps, and other associated work.
  Addendum #1 (click to expand/collapse)
Name Size
Paths 2019 - Addendum No. 1 365.5 KB