Bishop Boulevard Bridges Deck Resurfacing

This project consists of resurfacing two bridge decks on Bishop Blvd (one at Paradise Creek, the other at South Fork Palouse River), including full depth removal of HMA on the existing bridge decks, bridge deck repair, and then placing a new waterproof membrane and a 3-inch HMA overlay. The project also includes resurfacing of bridge approaches with a 2- to 3-inch HMA removal and subsequent overlay, construction of five (5) new curb ramps, erosion control, traffic control, and other work as shown on the plans. Scope of work includes the following: Civil Construction , Excavation / Earthworks, Grading, Stormwater, Asphalt, Concrete, Curbs & Gutters, Erosion Control, Landscape / Irrigation, Sidewalks, Signing & Illumination, Traffic Control.

Status

Bidding Closed

Bid Date2/27/18 10:00 am

Company & Contacts

City of Pullman

Bethany Johnson, bethany.johnson@pullman-wa.gov   509-338-3213

Location

Pullman, Eastern WA

Project Estimate: $228,000.00

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.