Sidewalks 2021 (21-02)

This project consists of removing and replacing approximately 430 square yards of cement concrete sidewalk; constructing approximately 291 square yards of new 4-inch thick sidewalk and 26 square yards of 5½-inch thick sidewalk, including three curb ramps; grinding approximately 226 linear feet of raised panel edges; and other miscellaneous related work.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover & TOC 1.0 MB
02 - Call for Bids 126.6 KB
03 - Bid Proposal 84.4 KB
04 - Qualification of Bidder 13.9 KB
05 - Bid Bond Form 13.7 KB
06 - Proposed Subcontractors List 14.0 KB
07 - Certification of Comliance with Wage Payment Statutes 85.1 KB
08 - Contract 18.3 KB
09 - Contract Bond 14.6 KB
10 - Insurance Coverage Questionnaire 15.5 KB
11 - Standard Construction Specifications - 2018 278.8 KB
12 - General Specifications 100.5 KB
13 - Special Provisions 178.7 KB
14 - Drawings 1.1 MB
15 - Standard Drawings (City) 934.8 KB
16 - WSDOT Drawing (f10.12-03_e) 143.3 KB
17a - Prevailing Wage Rates Part 1 201.5 KB
17b - Prevailing Wage Rates Part 2 136.8 KB
18 - Sidewalks 2021 - Sidewalk Survey 320.5 KB